• 120 YEARS WITH KNOWLEDGE

    We have been transforming energy into resource for 120 years with knowledge, experience and tradition

QUICK
CONTACT

FAILURE NOTICE
(24/7)

+386 1230 40 02

SCHEDULED OUTAGES

All scheduled outages

ALL CONTACTS

IS YOUR POWER OUT?

In the event of an electrical outage, you can check to see if any work was planned in your area and the current status of the grid.

NETWORK CONDITIONS

SCHEDULED OUTAGES

OUTAGE TIPS

  • Check whether your neighbours are also experiencing an electricity outage or whether public lighting is working.
  • Check your fuse box to see if you have blown a fuse.
  • Check whether the FID switch is off.

QUICK CONTACT

ALL CONTACTS

DISRUPTION
NOTICES

We can notify you by SMS messages or electronic mail, free of charge, about any planned disruptions of the electricity supply at your meter reading point.

WE ARE LIGHTING THE FUTURE - 120 YEARS OF ELEKTRO LJUBLJANA

 
 

Frequently asked questions

We keep collecting frequently asked questions from the users in our knowledge base.

EXPLORE OUR KNOWLEDGE DATABASE

How much does it cost when a person authorised by the system operator (acceptance and connection) connects a new metering point or changes the current one?

You can view the costs in the Services for Users pricelist (B-4).

More

What is the cost of network access for each individual connected load?

The prices of network access (one-off payment) can be found on the Energy Agency's website.

More

What does it cost to acquire a connection approval, a connection contract, metering point acceptance, and a connection when the nominal value of the main fuse is 3 x 20 A?

The costs of connecting to the electricity distribution network depend on the connected load (network access) and the costs of acceptance and connecting the metering point.

More

What are the costs of a new connected load for a household in the event of an increasing the main fuse from 1 x 20 A to 1 x 35 A?

What are the costs of a new connected load for a household in the event of increasing the main fuse from from 1 x 20 A to 1 x 35 A?

More